Projects
| Title/Description | Phase | Status | |
|---|---|---|---|
| Bolton Dining Hall |
Auxiliary Services This project will develop a new 67,000 sq food service facility. Construction will include space for an expanded meal plan, operations facility, retail food sales space, catering facilities, and administrative office space. | Programming | Active |
| Building 1512 - Renewal/Replacement and Fresh-Air Project |
Auxiliary Services This project involves the replacement of several interior components, surfaces and the current fresh-air system in Building 1512. The improvements of the building's interior components and surfaces include painting, counter top replacements, flooring replacement, and bathtub replacements. At this time, the air circulation system is located in the attic and is inefficient in relation to the building's size and scope. The old air system will be replaced with a more energy efficient and maintainable solution. In addition, it will be installed in a newly designated space on the top floor of the building, this will allow easier access for maintenance personnel. | Construction | Active |
| Building 1516 - Student Housing |
Student Affairs Building 1516 provides double and single rooms with private bath accommodations geared toward non-first-year, undergraduate students. The new dorm recently achieved LEED Gold Certification making it the second UGA building to achieve this status. http://housing.uga.edu/residence/tour/reed/building-1516 | Completed/Warranty | Active |
| Clark Howell Hall - 2nd Floor Renovation |
Auxiliary Services The Office of External Affairs is seeking funds to renovate the Career Center located in Clarke Howell Hall. The Career Center occupies a majority of the buildings' second floor and serves as a hub for students to meet and interview with potential employers. The space has many deficiencies due to the buildings age (built in 1936) and the proposed renovation addresses these needs. | Proposed | Active |
| College of Veterinary Medicine Pathology Lab Renovation -- Phase 1A |
Academics & Research This project is currently in Phase 1A of the renovation of a portion of the pathology laboratories on the first floor of Building #1070. The University's goal is to offer students, faculty and staff an updated efficient space that will facilitate a comprehensive study of veterinary medicine. | Design | Active |
| DW Brooks Mall |
Infrastructure & Greenspace The final phase of D.W. Brooks Mall terminating at Cedar Street and Conner Hall is in the planning stage. | Planning | Active |
| East Campus Master Plan |
Infrastructure & Greenspace A master plan to improve pedestrian/vehicular circulation and natural resources on East Campus. | Planning | Active |
| George Hall |
Health Sciences Campus This project continues the renovation of the historic buildings located on the Health Sciences Campus. This is a minor renovation that will address both life safety and ADA code compliance in the 360 seat auditorium space on the Campus. | Construction | Active |
| Georgia Quad |
Infrastructure & Greenspace A new quadrangle greenspace to serve as the western gateway into UGA's central precinct. The "Georgia Quad" will incorporate tall canopy trees, turf, and a sub-surface cistern to collect and store rainwater. | Completed/Warranty | Active |
| Greenhouse Master Plan |
Infrastructure & Greenspace A study to provide up-to-date greenhouse facilities and accommodate future development on main campus. | Planning | Active |