Projects

Title/Description Phase Status
Bolton Dining Hall
Auxiliary Services
This project will develop a new 67,000 sq food service facility. Construction will include space for an expanded meal plan, operations facility, retail food sales space, catering facilities, and administrative office space.
Programming Active
Building 1512 - Renewal/Replacement and Fresh-Air Project
Auxiliary Services
This project involves the replacement of several interior components, surfaces and the current fresh-air system in Building 1512. The improvements of the building's interior components and surfaces include painting, counter top replacements, flooring replacement, and bathtub replacements. At this time, the air circulation system is located in the attic and is inefficient in relation to the building's size and scope. The old air system will be replaced with a more energy efficient and maintainable solution. In addition, it will be installed in a newly designated space on the top floor of the building, this will allow easier access for maintenance personnel.
Construction Active
Building 1516 - Student Housing
Student Affairs
Building 1516 provides double and single rooms with private bath accommodations geared toward non-first-year, undergraduate students. The new dorm recently achieved LEED Gold Certification making it the second UGA building to achieve this status. http://housing.uga.edu/residence/tour/reed/building-1516    
Completed/Warranty Active
Clark Howell Hall - 2nd Floor Renovation
Auxiliary Services
The Office of External Affairs is seeking funds to renovate the Career Center located in Clarke Howell Hall. The Career Center occupies a majority of the buildings' second floor and serves as a hub for students to meet and interview with potential employers. The space has many deficiencies due to the buildings age (built in 1936) and the proposed renovation addresses these needs.
Proposed Active
College of Veterinary Medicine Pathology Lab Renovation -- Phase 1A
Academics & Research
This project is currently in Phase 1A of the renovation of a portion of the pathology laboratories on the first floor of Building #1070. The University's goal is to offer students, faculty and staff an updated efficient space that will facilitate a comprehensive study of veterinary medicine.
Design Active
DW Brooks Mall
Infrastructure & Greenspace
The final phase of D.W. Brooks Mall terminating at Cedar Street and Conner Hall is in the planning stage.
Planning Active
East Campus Master Plan
Infrastructure & Greenspace
A master plan to improve pedestrian/vehicular circulation and natural resources on East Campus.
Planning Active
George Hall
Health Sciences Campus
This project continues the renovation of the historic buildings located on the Health Sciences Campus.  This is a minor renovation that will address both life safety and ADA code compliance in the 360 seat auditorium space on the Campus.
Construction Active
Georgia Quad
Infrastructure & Greenspace
A new quadrangle greenspace to serve as the western gateway into UGA's central precinct. The "Georgia Quad" will incorporate tall canopy trees, turf, and a sub-surface cistern to collect and store rainwater.
Completed/Warranty Active
Greenhouse Master Plan
Infrastructure & Greenspace
A study to provide up-to-date greenhouse facilities and accommodate future development on main campus.
Planning Active
Text Only Options

Top of page


Text Only Options

Open the original version of this page.

Usablenet Assistive is a UsableNet product. Usablenet Assistive Main Page.